top of page

Total Kids Dental

Menifee, CA.

Other projects

Interested in more projects like this?

Check out the list for more projects in this industry!

Brickhouse

Gilbert, AZ.

CR Smiles Dental Implant Center

Glendale, AZ.

Dr. Daniel Zadeh

Saratoga, CA.

Macdonald Orthodontics

Macdonald Orthodontics

Contact Us

info@Ardebilieng.com

Tel: 480-626-7072

  • 7328 E Stetson Dr. Scottsdale, AZ 85251

  • Blvd. Luis Donaldo Colosio Murrieta 450,

    83250 Hermosillo, SON

    (Edificio Metrocentro Local 2 Piso 10)

Engineering the future. © 2025 Ardebili Engineering.

  • 6,000 SF

  • 2024

  • Almond ADG

Our team provided Mechanical, Plumbing, and Electrical Engineering construction documents for a 6,000 SF tenant improvement (TI) for a dental office, ensuring a well-coordinated and efficient design tailored to the needs of a modern dental facility.

For the mechanical scope, we designed a new air distribution system utilizing the existing A/C to optimize airflow and comfort throughout the space. The electrical design included breaking out the existing service to isolate this TI, incorporating new electrical panels, and designing new lighting systems to complement the updated ceiling layout. Our plumbing design supported the addition of new restrooms, a breakroom, and a utility area, ensuring seamless integration of all essential services.

By focusing on functionality, efficiency, and compliance with industry standards, we provided a comprehensive engineering solution that supports both patient comfort and the operational needs of the dental practice.

  • 6,000 SF

  • 2024

  • Almond ADG

Our team provided Mechanical, Plumbing, and Electrical Engineering construction documents for a 6,000 SF tenant improvement (TI) for a dental office, ensuring a well-coordinated and efficient design tailored to the needs of a modern dental facility.

For the mechanical scope, we designed a new air distribution system utilizing the existing A/C to optimize airflow and comfort throughout the space. The electrical design included breaking out the existing service to isolate this TI, incorporating new electrical panels, and designing new lighting systems to complement the updated ceiling layout. Our plumbing design supported the addition of new restrooms, a breakroom, and a utility area, ensuring seamless integration of all essential services.

By focusing on functionality, efficiency, and compliance with industry standards, we provided a comprehensive engineering solution that supports both patient comfort and the operational needs of the dental practice.

bottom of page