top of page

Signetix Powder Coating

Phoenix, AZ.

Other projects

Interested in more projects like this?

Check out the list for more projects in this industry!

Metro South

Phoenix, AZ.

Bram Flooring

Surprise, AZ.

Boutique Warehouse

Hialeah, FL.

Industrial Tilt

Industrial Tilt

Contact Us

info@Ardebilieng.com

Tel: 480-626-7072

  • 7328 E Stetson Dr. Scottsdale, AZ 85251

  • Blvd. Luis Donaldo Colosio Murrieta 450,

    83250 Hermosillo, SON

    (Edificio Metrocentro Local 2 Piso 10)

Engineering the future. © 2025 Ardebili Engineering.

  • 24,000 SF

  • 2022

  • Signetix, Inc.

We provided Mechanical, Plumbing, and Electrical Engineering construction documents for the 24,000 SF tenant improvement of a powder coating facility, ensuring the space was optimized for efficient operations. Our scope included a 5,000 SF office area, which required HVAC modifications, while the warehouse remained without HVAC per project requirements.

The facility underwent key modifications, including converting the existing kitchen into a restroom to accommodate operational needs. Our engineering design incorporated compressed air and natural gas connections to support specialized equipment, including two small batch booths, one large batch booth, a large oven, and a small oven. Additionally, we designed systems for a large paint line and a small paint line, both featuring conveyors, wash systems, and heating components to ensure a seamless coating process.

To support outdoor operations, we also designed dry systems for the exterior batch booths, ensuring compliance with safety and performance standards. Through our engineering solutions, we helped optimize the facility for efficient powder coating processes while meeting operational and regulatory requirements.

  • 24,000 SF

  • 2022

  • Signetix, Inc.

We provided Mechanical, Plumbing, and Electrical Engineering construction documents for the 24,000 SF tenant improvement of a powder coating facility, ensuring the space was optimized for efficient operations. Our scope included a 5,000 SF office area, which required HVAC modifications, while the warehouse remained without HVAC per project requirements.

The facility underwent key modifications, including converting the existing kitchen into a restroom to accommodate operational needs. Our engineering design incorporated compressed air and natural gas connections to support specialized equipment, including two small batch booths, one large batch booth, a large oven, and a small oven. Additionally, we designed systems for a large paint line and a small paint line, both featuring conveyors, wash systems, and heating components to ensure a seamless coating process.

To support outdoor operations, we also designed dry systems for the exterior batch booths, ensuring compliance with safety and performance standards. Through our engineering solutions, we helped optimize the facility for efficient powder coating processes while meeting operational and regulatory requirements.

bottom of page