top of page

Metro South

Phoenix, AZ.

Other projects

Interested in more projects like this?

Check out the list for more projects in this industry!

Bram Flooring

Surprise, AZ.

Boutique Warehouse

Hialeah, FL.

Industrial Tilt

Tucson, AZ.

Signetix Powder Coating

Signetix Powder Coating

Contact Us

info@Ardebilieng.com

Tel: 480-626-7072

  • 7328 E Stetson Dr. Scottsdale, AZ 85251

  • Blvd. Luis Donaldo Colosio Murrieta 450,

    83250 Hermosillo, SON

    (Edificio Metrocentro Local 2 Piso 10)

Engineering the future. © 2025 Ardebili Engineering.

  • 122,500 SF

  • 2024

  • Almond ADG

We provided Mechanical, Plumbing, and Electrical Engineering construction documents for the approximately 122,500 SF tenant improvement of an existing distribution center. Our design included a new air conditioning system throughout the facility, enhancing climate control for improved working conditions. We also designed new restrooms on the first floor and reconfigured the second-floor restrooms to include an expansion and a new mop sink to accommodate increased usage and operational needs.

For the electrical scope, we provided a new service feed to the building from a 43rd Ave. SRP pole, incorporating two 600-amp service sections along with new panel installations to support the facility’s power requirements. Additionally, we designed new lighting throughout the space to ensure proper illumination for warehouse and operational activities while maintaining energy efficiency. Minimal new outlets were included based on functional requirements.

By integrating these upgrades, we contributed to the overall modernization of the distribution center, improving efficiency, functionality, and the working environment for occupants.

  • 122,500 SF

  • 2024

  • Almond ADG

We provided Mechanical, Plumbing, and Electrical Engineering construction documents for the approximately 122,500 SF tenant improvement of an existing distribution center. Our design included a new air conditioning system throughout the facility, enhancing climate control for improved working conditions. We also designed new restrooms on the first floor and reconfigured the second-floor restrooms to include an expansion and a new mop sink to accommodate increased usage and operational needs.

For the electrical scope, we provided a new service feed to the building from a 43rd Ave. SRP pole, incorporating two 600-amp service sections along with new panel installations to support the facility’s power requirements. Additionally, we designed new lighting throughout the space to ensure proper illumination for warehouse and operational activities while maintaining energy efficiency. Minimal new outlets were included based on functional requirements.

By integrating these upgrades, we contributed to the overall modernization of the distribution center, improving efficiency, functionality, and the working environment for occupants.