Chinatown Navigation Center
Salinas, CA.
7328 E Stetson Dr. Scottsdale, AZ 85251
Blvd. Luis Donaldo Colosio Murrieta 450,
83250 Hermosillo, SON
(Edificio Metrocentro Local 2 Piso 10)
Engineering the future. © 2025 Ardebili Engineering.
3,600 SF
2023
RPM Team
We provided Mechanical, Plumbing, and Electrical Engineering services for the 3,600 SF tenant improvement of an existing building to accommodate a navigation center. The plumbing scope included the installation of a new sewer main, the removal of a janitor sink in the laundry room, replacing wall-hung china lavatories with group-type trough sinks that meet ADA requirements, and replacing lavatory faucets. Additionally, we rebuilt the showers with vandal-resistant wall units. The electrical scope involved coordinating with the mechanical team for fan replacement, installing new lighting in the shower areas, and replacing wiring and outlets to support a new shower trailer, with plumbing already in place for the connection.
3,600 SF
2023
RPM Team
We provided Mechanical, Plumbing, and Electrical Engineering services for the 3,600 SF tenant improvement of an existing building to accommodate a navigation center. The plumbing scope included the installation of a new sewer main, the removal of a janitor sink in the laundry room, replacing wall-hung china lavatories with group-type trough sinks that meet ADA requirements, and replacing lavatory faucets. Additionally, we rebuilt the showers with vandal-resistant wall units. The electrical scope involved coordinating with the mechanical team for fan replacement, installing new lighting in the shower areas, and replacing wiring and outlets to support a new shower trailer, with plumbing already in place for the connection.