top of page

Avalon Office Building

Goodyear, AZ.

Other projects

Interested in more projects like this?

Check out the list for more projects in this industry!

Chasse Building

Tempe, AZ.

Horizon Rd Commercial Offices

Rockwall, TX.

7493 N Oracle Rd

Tucson, AZ.

Desert Canyon

Desert Canyon

Contact Us

info@Ardebilieng.com

Tel: 480-626-7072

  • 7328 E Stetson Dr. Scottsdale, AZ 85251

  • Blvd. Luis Donaldo Colosio Murrieta 450,

    83250 Hermosillo, SON

    (Edificio Metrocentro Local 2 Piso 10)

Engineering the future. © 2025 Ardebili Engineering.

  • 18,000 SF

  • 2021

  • Almond ADG

We provided Mechanical, Plumbing, and Electrical Engineering construction documents for a new 18,000 SF, two-story office shell building. The scope of work for each discipline includes key elements to support the future development of the space.

Electrical Engineering focused on the core lighting system for the building, ensuring efficient illumination in the central areas. The design included the necessary electrical infrastructure for future tenant-specific needs.

Plumbing Engineering included the design for restrooms on both the first and second floors, as well as a drinking fountain and mop sink. Additionally, we provided water and waste lines running down the center of the building, leaving room for future tenant-specific plumbing connections and adaptations.

Mechanical Engineering addressed the A/C system for the central core of the building, ensuring that the core areas are adequately climate-controlled to support the building's function.

The design documents provide a comprehensive foundation for the future tenant buildouts while ensuring that the building systems are properly integrated and ready for future adaptations.

  • 18,000 SF

  • 2021

  • Almond ADG

We provided Mechanical, Plumbing, and Electrical Engineering construction documents for a new 18,000 SF, two-story office shell building. The scope of work for each discipline includes key elements to support the future development of the space.

Electrical Engineering focused on the core lighting system for the building, ensuring efficient illumination in the central areas. The design included the necessary electrical infrastructure for future tenant-specific needs.

Plumbing Engineering included the design for restrooms on both the first and second floors, as well as a drinking fountain and mop sink. Additionally, we provided water and waste lines running down the center of the building, leaving room for future tenant-specific plumbing connections and adaptations.

Mechanical Engineering addressed the A/C system for the central core of the building, ensuring that the core areas are adequately climate-controlled to support the building's function.

The design documents provide a comprehensive foundation for the future tenant buildouts while ensuring that the building systems are properly integrated and ready for future adaptations.

bottom of page