top of page

American Leadership Academy Theater

ALA Mesa North Campus, AZ

Other projects

Interested in more projects like this?

Check out the list for more projects in this industry!

I Smash

Omaha, NE.

Bowlski

Flagstaff, AZ.

The Dauz

Phoenix, AZ.

Copper Blues

Copper Blues

Contact Us

info@Ardebilieng.com

Tel: 480-626-7072

  • 7328 E Stetson Dr. Scottsdale, AZ 85251

  • Blvd. Luis Donaldo Colosio Murrieta 450,

    83250 Hermosillo, SON

    (Edificio Metrocentro Local 2 Piso 10)

Engineering the future. © 2025 Ardebili Engineering.

  • 56,000 SF

  • 2023

  • Carhuff+Cueva architects LLC

Our team provided Mechanical, Plumbing, and Electrical Engineering construction documents for a 56,000 SF, two-story ground-up theater.

We designed an advanced HVAC system to support the large performance and audience spaces, ensuring comfort and air quality throughout. Plumbing services included restrooms, drainage, and water supply systems, with careful consideration for high-capacity needs and accessibility.

The electrical design incorporated stage lighting, power distribution, and energy-efficient systems for both public and backstage areas, creating a versatile and reliable infrastructure for performances. The overall layout ensured that both technical and aesthetic aspects of the theater were seamlessly integrated.

This project prioritizes performance, energy efficiency, and functionality, creating an exceptional venue for live events.

  • 56,000 SF

  • 2023

  • Carhuff+Cueva architects LLC

Our team provided Mechanical, Plumbing, and Electrical Engineering construction documents for a 56,000 SF, two-story ground-up theater.

We designed an advanced HVAC system to support the large performance and audience spaces, ensuring comfort and air quality throughout. Plumbing services included restrooms, drainage, and water supply systems, with careful consideration for high-capacity needs and accessibility.

The electrical design incorporated stage lighting, power distribution, and energy-efficient systems for both public and backstage areas, creating a versatile and reliable infrastructure for performances. The overall layout ensured that both technical and aesthetic aspects of the theater were seamlessly integrated.

This project prioritizes performance, energy efficiency, and functionality, creating an exceptional venue for live events.

bottom of page