top of page

American Leadership Academy

Apache Junction, AZ.

Other projects

Interested in more projects like this?

Check out the list for more projects in this industry!

American Leadership Academy

Peoria, AZ.

American Leadership Academy

Sierra Vista, AZ.

Greathearts Buckeye

Buckeye, AZ.

Legacy Traditional Schools

Legacy Traditional Schools

Contact Us

info@Ardebilieng.com

Tel: 480-626-7072

  • 7328 E Stetson Dr. Scottsdale, AZ 85251

  • Blvd. Luis Donaldo Colosio Murrieta 450,

    83250 Hermosillo, SON

    (Edificio Metrocentro Local 2 Piso 10)

Engineering the future. © 2025 Ardebili Engineering.

  • 13,200 SF

  • 2024

  • Carhuff+Cueva architects LLC

We provided Mechanical, Plumbing, and Electrical Engineering construction documents for seven 13,200 SF ground-up classroom buildings, designed to meet the educational needs of the site. Our engineering services included the development of plans for three distinct buildings, each with unique requirements.

Building 1 consists of a kindergarten area, designed with additional single-use restrooms. We provided the necessary utility coordination to support the restrooms and all other building systems. Building 2 is designed with 12 classrooms, excluding labs, with two restrooms available on-site for the students and staff. Building 3 includes 12 classrooms, two of which are specialized lab classrooms, and we designed the necessary infrastructure to support these more demanding spaces.

In addition to the core building designs, we included one engineering site visit or site observation if needed during the construction phase, ensuring the proper implementation of our plans. Our scope also included utilities coordination to ensure seamless integration of water, electrical, and HVAC systems throughout the campus, along with the electrical site distribution to ensure all buildings receive the proper power and system services required for educational operations.

Our design and coordination efforts ensured that the educational facility would meet all operational, safety, and compliance standards for classrooms, labs, and restroom facilities.

  • 13,200 SF

  • 2024

  • Carhuff+Cueva architects LLC

We provided Mechanical, Plumbing, and Electrical Engineering construction documents for seven 13,200 SF ground-up classroom buildings, designed to meet the educational needs of the site. Our engineering services included the development of plans for three distinct buildings, each with unique requirements.

Building 1 consists of a kindergarten area, designed with additional single-use restrooms. We provided the necessary utility coordination to support the restrooms and all other building systems. Building 2 is designed with 12 classrooms, excluding labs, with two restrooms available on-site for the students and staff. Building 3 includes 12 classrooms, two of which are specialized lab classrooms, and we designed the necessary infrastructure to support these more demanding spaces.

In addition to the core building designs, we included one engineering site visit or site observation if needed during the construction phase, ensuring the proper implementation of our plans. Our scope also included utilities coordination to ensure seamless integration of water, electrical, and HVAC systems throughout the campus, along with the electrical site distribution to ensure all buildings receive the proper power and system services required for educational operations.

Our design and coordination efforts ensured that the educational facility would meet all operational, safety, and compliance standards for classrooms, labs, and restroom facilities.

bottom of page